A system becomes economically oversized when the incremental kWp generates electricity that will almost always be exported (at 20 c/kWh) rather than consumed (at 30 c/kWh). The “diminishing returns zone” starts when:

  • Your annual export exceeds 60% of total generation (without battery)
  • Your roof space would push you past 6 kWp but you have no battery, EV, or heat pump
  • The extra panels cost more than the export income they generate over 7 years

In these cases, money is better spent on a battery, EV charger, or immersion diverter — all of which convert more of your generation into higher-value self-consumption.